Transportation & Installation Capability
IPC is equipped with oversized and overweight freight transportation vehicles and crane equipment to be able of carrying out:
- Transport of equipment/structure with size of up to 81m
- Installation of equipment with weight of over 200 tons at height of over 140m.
WATERWAY AND INLAND TRANSPORTATION

Transporting turbine blades using “Blade Adapter” specialised equipment
TRANSFORMER INSTALLATION, WIND TURBINE ERECTION
![]() |
![]() |
![]() |
![]() |
WIND TURBINE ERECTION
![]() |
![]() |
![]() |
![]() |
TRANSFORMER INSTALLATION
25/11/2021