Solar O&M | Hau Giang Solar Power Plant
IPC offer international perspective of the best practices in plant inspection procedures, quality assessment plans and checklists for maintenance.
- Project: Hau Giang Solar Power Plant
- Client: VKT – Hoa An Solar Power JSC
- Capacity: 35 MWp
- Province: Hau Giang
- Role in the project: O&M Contractor
- Project value: 14 Billion VND
- Contract period: 12/2020-12/2022
![](https://ipcenc.com.vn/wp-content/uploads/2021/11/z2224650353246_44c0c8df3d8379c55b9c345472a6658e-1-scaled.jpg)
![](https://ipcenc.com.vn/wp-content/uploads/2021/11/Tu-dieu-khien-tai-cho-Dao-Cach-Ly-220kV.jpg)
![](https://ipcenc.com.vn/wp-content/uploads/2021/11/z2222495676537_24c7d683a0f780584c67cfb082b0501d-scaled.jpg)