Wind O&M | Lac Hoa 2 Wind Power Plant

IPC offer international perspective of the best practices in plant inspection procedures, quality assessment plans and checklists for maintenance.

Our approaches: preventative maintenance, corrective maintenance, condition-based maintenance.

  • Project: Lac Hoa 2 Wind Power Plant
  • Client: Lac Hoa 2 Wind Power Co., Ltd
  • Capacity: 130 MW
  • Province: Soc Trang
  • Package: BOP O&M Contractor
  • Project value: 15 Billion VND
  • Contract Period: 01/2022 – 01/2024