Wind O&M | Lac Hoa 2 Wind Power Plant
IPC offer international perspective of the best practices in plant inspection procedures, quality assessment plans and checklists for maintenance.
Our approaches: preventative maintenance, corrective maintenance, condition-based maintenance.
- Project: Lac Hoa 2 Wind Power Plant
- Client: Lac Hoa 2 Wind Power Co., Ltd
- Capacity: 130 MW
- Province: Soc Trang
- Package: BOP O&M Contractor
- Project value: 15 Billion VND
- Contract Period: 01/2022 – 01/2024
![](https://ipcenc.com.vn/wp-content/uploads/2021/11/om-dien-gio.png)
![](https://ipcenc.com.vn/wp-content/uploads/2021/11/om-gio.png)
![](https://ipcenc.com.vn/wp-content/uploads/2021/11/OnM-wind-1.png)